NAME : ASHA SHARMA
ADDRESS : 5353 SOUTH COLUMBIA PIKE APT 502
ADDRESS2 :
CITY : Arlington
STATE : VA
ZIP_CODE : 22204
PHONE : 3126220986
EXPERIENCE : 7
Position_Desired : manager/ senior consultant / senior planner/ senior DATE_AVAILABLE : Immediately RESUME : ASHA SHARMA 5353 South Columbia Pike, Apt 502 Arlington, VA 22204 ash_j481@yahoo.co.in
+1(312) 622-0986
Education .
Auburn University, Auburn, AL; Master of Science, Transportation Engineering (fellowship), 2006. BMS College of Engineering, Bangalore, India; Bachelor of Science, Transportation Engineering (first class), 2003.
. Accolades .
Awarded New Face of Engineering 2007-08 by National Engineers Week Foundation, for professional work making positive impact on society. Nominated by the Society of Automotive Engineers (SAE) International.
. Professional Experience .
RICONDO & ASSOCIATES Alexandria, VA
Senior Consultant, Airports 2009 – Present
General responsibilities:
• Responsible for developing scope, timelines and budget.
• Liaison to clients on active projects.
• Evaluate and recommend alternatives towards improving performance of terminal curbside operations.
• Develop strategic plans for managing airport facilities for revenue generation.
• Estimate costs associated with infrastructure developments.
• Develop phasing plans and temporary traffic circulation patterns during general maintenance work.
• Develop construction-phasing plans for new developments.
Key projects
• DFW, TX: Worked with a team of five, in a successful marketing effort, towards securing on-call contract with the airport. Task required assisting the airport in evaluation of their future, curbside management alternatives, through visual simulation models and developing plans for phasing-in the implementation of chosen alternatives. Work completed within time and budget.
• AUH, Abu Dhabi: Worked closely with team-lead and key project contact at Abu Dhabi, in developing conceptual layout of new infrastructure on airport property. Outlined high-level requirements for key modifications in existing infrastructure to facilitate transition into future usage.
• IAD & DCA, VA: Successfully managed life cycle of project evaluating alternative fuel technologies for present use at both airports. Developed scope, timeline and budget. Lead meetings with clients. Worked closely with the client, industry personnel and market experts, throughout the project. Completed a financial, cost-of-ownership analysis. Delivered final recommendations, in combined presentation to senior level management of the two airports.
• IAD & DCA, VA: Completed financial and technical evaluation of on-site power generation alternatives, towards reducing dependence on external power sources for IAD and DCA. Identified feasible on-site power generation solutions. Evaluated environmental, and regulatory considerations.
HNTB CORPORATION Arlington, VA
Engineer – II, Traffic Operations / Intelligent Transportation Systems (ITS) 2007- 2009
General Responsibilities:
• Selection and field-testing of telecommunication equipment. Developed usage guidelines.
• Engineered integration strategy for traffic monitoring and telecommunication equipment.
• Trained data-collection personnel
• Collaborated and managed engineering design effort with sub-consultants.
• Developed signal systems design (operational phasing, equipment layout on field, power connections) and troubleshot issues on traffic and system operations.
• Evaluating revenue generation potential of roadways for purposes of tolls.
• Calculating tolls pricing. Determine toll station management infrastructure.
• Developed Maintenance of Traffic plans.
• Complied technical reports on projects.
Key projects
• VDOT: Developed deployment strategy and operational plan for visual traffic monitoring equipment, with focus on security and evacuation purposes, along I-66W in VA. Proposed upgrades for existing equipment. Identified new locations and equipment to provide a seamless visual coverage of the project corridor from the VDOT traffic operations center. Delivered presentation on methodology and results to senior level management.
• VDOT / Transurban / Flour, VA: Collaborated signal system design work with sub-consultants on the High Occupancy Toll (HOT) lanes project. Developed phasing for signal operations both during construction and for regular operation. Developed signal equipment layout (detectors, power connections, signal poles, signage).
• NJ Turnpike Authority: Outlined requirements of a third-party software that would manage the construction and maintenance schedules for the portion of overlap of the two freeways to prevent delays caused by paper based management of schedules. Regulatory guidelines for each expected maintenance work were in compliance with NJDOT, NJTA.
• VDOT: Teamed with sub-consultant and county engineers in a comprehensive real-time optimization of traffic signals network in the Arlington County. Testing completed with travel-time runs, field-observation of changes in delay and queue lengths during peak-periods.
• VDOT: Proposed congestion mitigation and traffic management measures along the I-66 corridor through ramp metering and active shoulder management.
• VDOT: Selected equipment for weather stations and identified deployment locations on the I-95/395/495 interchange ramps. Equipment would convey information to the operations center, to be used towards providing early warnings and traffic management in the area, especially during severe weather condition.
• CLT, NC: Upgraded existing static signage to dynamic parking guidance system at a local airport. Outlined the interface between existing and new parking system. Outlined implementation and operation strategy in a report presented to the airport.
DRAPER ADEN & ASSOCIATES Richmond, VA
Engineer – I, Transportation Planner 2006-2007
• Successfully completed training in risk assessment, project management and technical writing.
• Worked with the Transportation Department Manager in developing and delivering proposal presentations and marketing interviews for projects. Managed client interactions in meetings.
• Developed engineering designs in compliance with Department of Transportation standards.
• Performed budgeting, task delegation and lead team on transportation projects.
• Guided field-technicians on data collection efforts and trained staff on procedures and equipment.
. Skills .
Vissim, Simmod (simulation), Synchro, AutoCAD (drafting), MS Word, MS Excel, MS PowerPoint
. References .
Available upon request
|